liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

this was an accident? and how do I delete it?
4c + 5d - 10c +12 - 11d + c
Write an essay explaining the ways in which mobile communication technology have improved in the following sectors: education, retail and politics
What is the end behavior when the degree of the numerator is the same as the degree of the denominator? a. The function approaches a horizontal asymptote. b. Th
When were 3 times when Lancelot was humerous in act 2 scene 2 in Mercant of Venice
Three ways to prevent teachers strikes
What are the degree measures?
What best explains the problem with installment buying ?
Which value represents the slope of the line that has an x-intercept at (-4,0) and a y-intercept at (0,-12) in the coordination plane?
A package of 24 water bottles is on sale for $6. How much does each water bottle cost?