Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

When sierra thinks about Chick-fil-A, she Emily thinks about the high-quality chicken that she last ate there, served hot and fresh by fast and friendly employe
What is the value of s? 150-1/2s=120+1/4s
What are some freedoms you receive in America that aren’t freedoms in every country?Why do you believe you receive the freedoms you mentioned above?
Why is “temperate” and “date” slant rhyme?
if a bloodstain has a length of 3.0cm and a width of 1.5cm what is the angle of impact?
Someone please help :) Both pls :)
thanks for the help!
Evaluate Enter the number that belongs in the green box
Find the missing side. Round to the nearest tenth. 22 11 Х
how do you say seal in french>:)