Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete
Help plz

Respuesta :

elitrad
elitrad elitrad
  • 03-07-2020

Answer:

% complete

Explanation:

% complete tracks progress (how far done you are, aka completion)

Answer Link
deliaaaxox deliaaaxox
  • 07-07-2020
Percent complete will be used to track progress on task that the user has created :))
Answer Link

Otras preguntas

In what sense can we say that the first break came to different world regions for different reasons and in different ways
most of the puerto rican's would prefer to be their own independent nation, separate from the US. True or False
Solve each inequality.Check your work
-x + 3y =6 I have to get the variable y by its self.
Butene has two isomers—one with methyl groups on the same side of the double bond and the other with methyl groups on the opposite side. What kind of isomers a
what is twenty less than twelve percent of a number minus the sum of twice the number and negative fifteen
Which of the following is true about expressing a theme in a poem or play? Writers use character dialogue to reveal the theme in poems and plays. Writers can on
Having a stronger negative or positive change on one side is called what ?
i still cant figure it out . ughh −2∣5w−7∣+9=−7
what is a material's ability to be dissolved in a solvent? A saturation, B solvent