sr9376328
sr9376328 sr9376328
  • 02-12-2020
  • Mathematics
contestada

men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

Help plz ,I’m having some difficulties
Which of the following expressions is true?A. 4^3 • 4^4 = 4^12B. 5^2 • 5^3 > 5^5C. 3^2 • 3^5 = 3^10D. 5^2 • 5^4 < 5^8​
Barry is 8 years older than his sister. In 3 years, he will be twice as old as she will be then. How old is each now?
Help please ASAP !!!
A whelk have a diameter of 16 meters. What is the area.
The magistrate calls Meursault “Monsieur Antichrist” because _____. Meursault believes that he is God Meursault does not believe in God Meursault believes that
A train of mass 320000 kg accelerate uniformly from rest. It takes 57 s to travel a distance of 810 m in a straight line. Find the average net force acting on t
solve for t - 7/4 = 2/5 (t) t=
g. If two triangles have three corresponding angles and three corresponding sides that are equal in measure, are the two triangles necessarily congruent? Why? H
Using a directrix of y = 5 with focus at (4, 1), what quadratic function is created? f(x) = 1/4(x − 4)2 − 3 f(x) = 1/8(x + 4)2 − 3 f(x) = −1/8(x − 4)2 + 3 f(x)