Jin schedules 496 hours for a project. He plans to work 8 hours each day. How many days will it take to complete the project?​

Respuesta :

penguinlife90 penguinlife90
  • 01-12-2021

Answer:

62 days

Step-by-step explanation:

496/8 = 62

Answer Link
clickykeyboardasmr
clickykeyboardasmr clickykeyboardasmr
  • 01-12-2021

496/8=62

Hope this helps!

Answer Link

Otras preguntas

If you tell the truth you don't have to remember anything meaning
Nathan and Sydney start out together on a bike trail that is 24 miles long. Nathan bikes at 88 miles per hour while Sydney bikes at 12 miles per hour. Which sta
What happens if syphilis is left untreated?​?
The length of a rectangular pool is 5 meters less than twice the width. if the pool's perimeter is 110 meters, what is the width?
What is nationalism? A. an individualist state of mind in which a person believes that a nation-state is dependent on their taxes B. a collective state of min
What is the slope of "The line through(5,7) and (5,-8)"?
Identify each account as asset​ (a), liability​ (l), or equity​ (e). a. accounts payable b. cash c. common stock d. accounts receivable e. rent expense f. servi
An isosceles triangle has a vertex angle of 26°. Two sides of the triangle are each 15 ft long. Find the area of the triangle.
Transform boundary is what
what is the main reason equatorial ocean water is warmer than polar ocean water?