khloesmith14 khloesmith14
  • 03-03-2022
  • Mathematics
contestada

A group of workers can plant 81 acres in 9 days. What is their rate in acres per day?

Respuesta :

lilswooosh082110 lilswooosh082110
  • 03-03-2022

Answer: 9 acres.

Step-by-step explanation:

9 times 9 in 81 easy math. hope this helps :)

Answer Link

Otras preguntas

Which serious lung infection causes the alveoli to fill up with fluid?
0.423 rational or irrational
Which of these is one way to quantify the personal value of a good service?
Ned rode his bike 7 miles to the library. he took a shortcut on the way home which was only 5 miles long. how many miles did ned ride altogether?
What factors led to the revival of trade in europe?
5.What was the most lasting accomplishment of the Progressive Movement
The two external openings into the nose are called the
A small bar magnet is placed in the magnetic field of a larger bar magnet, at the position marked Z in the diagram below. Assuming the small bar magnet is free
Page Debra made $ 80 for 5 hours of work. At the same rate, how much would she make for 17 hours of work?
Two mechanics worked on a car. The first mechanic charged 105 per hour, and the second mechanic charged 75 per hour. The mechanics worked for a combined total o