ellz7oetugaalagirl ellz7oetugaalagirl
  • 02-03-2017
  • Computers and Technology
contestada

To reduce chances of system failure, engineers may use _____ .

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 15-03-2017
To reduce chances of system failure, engineers may use process control. This is a system which involves activities that ensures the whole process variables can be predicted and controlled to prevent failure. This involves the use of safety valves and sensors.
Answer Link
reyesandrew002 reyesandrew002
  • 13-07-2018

Performance testing // Gradpoint Homies

Answer Link

Otras preguntas

A nonconservative force does the same work regardless of the path taken. True or false ?
The color of a star depends on its , and -colored stars are the coolest.
If you were to become a parent as a teenager, what kind of challenges do you think you would face?
The structure of the periodic table is based on the distribution of A- protons B- electrons in each element. The elements are arranged in horizontal A- periods
If you were to become a parent as a teenager, what kind of challenges do you think you would face?
Solve by your method of choice.
How do I Solve This? Please help me!!
Some statistics show that people who are more educated have fewer children. Which of the following could possibly explain this phenomenon? A. People who are mor
What is the weight of a basketball with a mass of 0.5 kg
Which statement describes a strong U.S. dollar?