An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

Which pair of ancient civilizations were ruled by dynasties?
A technology company only hires applicants who are under the age of 30. This company could face possible __________ consequences. A. academic B. gender C. le
Write two equivalent fractions with 2/5=
Read the excerpt from chapter 4 of The Strange Case of Dr. Jekyll and Mr. Hyde. Presently her eye wandered to the other, and she was surprised to recognise in h
Which equation represents the line passing through the points (3,2) and (-9,6)?
Is the correct answer B?
The area of a rectangle is 56 cm. The length is 2 cm more than x and the width is 5 cm less than twice x. Solve for x. Round to the nearest whole number.
If the mass of the spacecraft were doubled, how much would the force of gravity would change?
Michael plots and connects the following points: A(-3,2), B(1,1), C(-3,4) and D(-5,-1). Which best describes the quadrilateral formed? a. Rectangle b. Rhombus
Factor completely: 9x to the 2 + 9x - 4